New York I-678 Bridge Replacement

Our client asked us to design and provide a sixteen point Synchronous Jacking System to both raise and remove the existing bridges spanning over the I-678.

The bridges were raised and placed on a set of rollers, then pushed off to the side so that they could be demolished and taken away. The new bridge was placed on rollers and rolled into position then lowered into place using the same sixteen point Synchronous Jacking System.

This was done for both bridges on I-678. The Jamaica Avenue Bridge and Hillside Avenue Bridge job was a big success.

Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.


 

 

I-678 Bridge Roll-in & Replacement

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.

Description of Project Scope of Bridge Work – – Remove entire superstructure – 110 feet long – Remove and relocate abutments – Remove and replace center pier stem – Install new two-span continuous bridge – 28 feet longer than existing Scope of Work on Van Wyck Expressway (I-678) – – Widen segment by addition of acceleration/deceleration lanes in both directions – Improve safety of VWE with full width flush shoulders – Resurface all six lanes over a half mile in length – Upgrades to drainage, lighting, ITS, signing, landscaping.

Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.