Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.

Our Client asked us to design a Jacking System that was capable of pulling new sections of the Syracuse Carrier Dome into place.

Our client was building sections of the roof on the ground, then raising them over the existing Carrier Dome witha crane and then using our 

Jacking System to pull the roof sections into place.

A combination of pull cylinders and centerhole cylinders were able to accomplish this. This system was still being used until the new Carrier Dome roof is complete.

I-678 Bridge Roll-in & Replacement

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.

Description of Project Scope of Bridge Work – – Remove entire superstructure – 110 feet long – Remove and relocate abutments – Remove and replace center pier stem – Install new two-span continuous bridge – 28 feet longer than existing Scope of Work on Van Wyck Expressway (I-678) – – Widen segment by addition of acceleration/deceleration lanes in both directions – Improve safety of VWE with full width flush shoulders – Resurface all six lanes over a half mile in length – Upgrades to drainage, lighting, ITS, signing, landscaping.

  • Why Roll-in/Roll-Out?
  • High local volumes – more than 1,100 VPH (peak)
  • High Expressway volumes ADT 160,000 (VWE)
  • Difficult to detour over extended period ƒ Problematic to stage due to highly congested area
  • Must maintain access to Jamaica Hospital.